KitLog pro

Powered By Kitlog Pro v2.0

Freds Web Site
' style=
Date:  12-24-1995
Number of Hours:  2.50
Manual Reference:  Fuselage CM P-84
Brief Description:  Worked on Canopy

Started at 9:30pm and Stopped at 12:00pm

Sanded a full radius on the outside edge of the conopy.

Cut off 1 inch of protective coating from the outside edge of the canopy.

Put 2 layers of electrical tape and 1 masking tape 5/8 inch from outside edge of the canopy.

Sanded the 5/8 inch area on the canopy with 220 grit paper.

Steps 9-10
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.