Powered By Kitlog Pro v2.0
Freds Web Site
Pulsar XP
All
12-23-1995
< Previous Log Entry
Next Log Entry >
Date:
12-23-1995
Number of Hours:
4.00
Manual Reference:
Fuselage CM P-82
Brief Description:
Bonded the canopy to the frame
Started at 1:00pm and Stopped at 5:00pm
Fit the canopy to the frame.
Prepared the canopy from bonding to the frame.
Bonded the canopy to the frame with structural adhesive. Steps 4 thru 8 Pages 82 thru 84
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Pulsar XP Home
Category
# Logs
# Hours
All
100
284
Avionics
1
3
Canopy
25
62
Fuselage
26
92
Inventory and Inspec
4
23
Landing Gear
11
21
Miscellaneous
1
4
Rudder
8
19
Vertical Stabilizer
16
37
Wings
8
23
Copyright © 2001-2024 Matronics. All Rights Reserved.