Powered By Kitlog Pro v2.0
Freds Web Site
Pulsar XP
All
11-24-1995
< Previous Log Entry
Next Log Entry >
Date:
11-24-1995
Number of Hours:
5.00
Manual Reference:
Fuselage Cm P-90
Brief Description:
Prepared and bonded the rudder hinge tub plug.
Started at 3:00pm and Stopped at 8:00pm
Checked rudder hindge tube splice bond and found no problems.
Prepared and bonded the rudder hinge tub plug.
Prepared and bonded the left, right and forward canopy tracks.
Steps 1 ad 2
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Pulsar XP Home
Category
# Logs
# Hours
All
100
284
Avionics
1
3
Canopy
25
62
Fuselage
26
92
Inventory and Inspec
4
23
Landing Gear
11
21
Miscellaneous
1
4
Rudder
8
19
Vertical Stabilizer
16
37
Wings
8
23
Copyright © 2001-2024 Matronics. All Rights Reserved.