KitLog pro

Powered By Kitlog Pro v2.0

Freds Web Site
' style=
Date:  11-7-1995
Number of Hours:  3.00
Manual Reference:  Fuselage CM P-56
Brief Description:  Completed sanding a 3/4 inch deep channel

Started at 9:00pm and Stopped at 12:00pm

Completed sanding a 3/4 inch deep channel on the back of the Vertical Stabilizer.

Fit rudder to the vertical stabilizer.

Cut hinge slot in rudder and 1/2 inch hole in the top of the rudder.

Bonded micro to yhe side of the vertical stabilizer where there was too much sanding for the channel on one side.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.