KitLog pro

Powered By Kitlog Pro v2.0

Freds Web Site
' style=
Date:  11-5-1995
Number of Hours:  6.00
Manual Reference:  Fuselage CM P-52..
Brief Description:  Prepared and bonded the two halfs of the vertical

Started at 2:30pm and Stopped at 8:30pm

Prepared and bonded the two halfs of the vertical stabilizer. Steps 5-8 and Steps 9-12 page 54.

Started work on the Aft bulkhead. Cut out the hole for the elevator pushrod and trim spring attach pin.

Bonded 4 pieces of unidirectional cloth and the trim spring attach pin. step 4 page 132 Wing CM and step 1 page of fuselage CM
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.