KitLog pro

Powered By Kitlog Pro v2.0

Frank's Panther Cave
' style=
Date:  3-1-2009
Number of Hours:  60.00
Manual Reference:  
Brief Description:  Fuselage

March work completed

Paint cockpit area with spray putty
Etch prime all brackets for master cylinders and rudder connections and apply first coat of matt black
Apply second coat to previous components
Etch prime control stick and pulley brackets - apply first coat to brackets
Apply spray putty to baggage door
Paint control stick matt black and pulley brackets
Etch prime and paint metal components matt black - glue first section of turtle deck
Second coat on metal components - glue other side of turtle deck - cut out rudder inspection holes
trim turtle deck and glue carbon fibre top sections to cowl entry
Glue aluminum rudder inspection plates together
Make rudder inspection plate holder
Make rudder inspection plate holder - chamfer and etch aluminium plates
Sand turtle deck blend and file trim carbon fibre top sections - check canopy fit
Make battery box and strap + battery solenoid mount and glue rudder entry plate mounts in position
in-fill batterybox and apply 1st coat varnish to inside turtle deck
Varnish 2nd coat on turtle deck and former 3 - cut out dummy dorsel fin - etch and paint sick pivots matt black
Firewall, cowl support and glue vertical fin in position and dorsel spline
Glue fillet block into fin and dorsel strengening blocks - trim balsa side panels
Dorsel fin - make balsa side add foam and trim
Sand dorsel fin - add resin and micro balloons
Drill 16mm holes in firewall for rubber wiring grommets
Drill 16mm hole and mounting holes for gasculator
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.