KitLog pro

Powered By Kitlog Pro v2.0

ETHAN'S WEB SITE
' style=
Date:  10-1-2013
Number of Hours:  1.75
Manual Reference:  9-14 steps 11/12
Brief Description:  Double Flush Riveting

Removed the proseal from the drilled holes of both elevators. Double flush rivet on the first elevator. Kids were sleeping so I could not start the second elevator.

Starting rolling the leading edge of the first elevator
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.