Powered By Kitlog Pro v2.0
ETHAN'S WEB SITE
RV-10
Elevator
9-28-2013
< Previous Log Entry
Next Log Entry >
Date:
9-28-2013
Number of Hours:
5.00
Manual Reference:
9-14
Brief Description:
Tank Sealant
Apply tank sealant to the elevators and trim tabs.
Used weights (as shown) to hold the trailing edges in place while the sealant cured.
Steps 8 & 9 on page 9-14 and step 9 on page 9-17
After the sealant was applied had some extra time and decided the cut the counterbalance weights to size. Completed step 8 on page 9-15
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
133
302
Elevator
30
64
Empennage
5
10
Horizontal Stailizer
14
47
Rudder
16
36
Shop
4
8
Tail Cone
44
100
Tools
3
3
Trim tabs
1
1
Vertical Stabilizer
16
33
Copyright © 2001-2024 Matronics. All Rights Reserved.