KitLog pro

Powered By Kitlog Pro v2.0

ETHAN'S WEB SITE
' style=
Date:  9-29-2013
Number of Hours:  1.75
Manual Reference:  10-2 steps 1-2
Brief Description:  First Tailcone Steps

Completed the first two steps of the tailcone while waiting for the proseal on the trailing edges of the elevators and trim tabs.

Threaded the tie down bar and match drilled the pieces that will become the F1012 bulkhead.

Also spent another 45 minutes gathering the components for the tailcone. Gathered the parts that will be used in the first 5 pages, including all the frames and bulkheads.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.