Powered By Kitlog Pro v2.0
ETHAN'S WEB SITE
RV-10
All
10-1-2013
< Previous Log Entry
Next Log Entry >
Date:
10-1-2013
Number of Hours:
1.75
Manual Reference:
9-14 steps 11/12
Brief Description:
Double Flush Riveting
Removed the proseal from the drilled holes of both elevators. Double flush rivet on the first elevator. Kids were sleeping so I could not start the second elevator.
Starting rolling the leading edge of the first elevator
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
133
302
Elevator
30
64
Empennage
5
10
Horizontal Stailizer
14
47
Rudder
16
36
Shop
4
8
Tail Cone
44
100
Tools
3
3
Trim tabs
1
1
Vertical Stabilizer
16
33
Copyright © 2001-2024 Matronics. All Rights Reserved.