KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
' style=
Date:  12-4-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Flight 98 - patterns

0.4 flight time, 4 ldg. Checkout the revised fuel system. Refilled the oil (completed oil change). Disconnected the panel radio power (pulled the fuse). Put the radio antenna onto th ehand held. Wind was favoring runway 21. This almost never happens. Oil only got to 145F. Outside air ~40F. New fuel system seems to work well. First landing was a little rusty after almost a month off. The next 3 were really nice. Sight picture to 21 is different, so I was high each time and had to do a little slip on final. Good to know it still runs. Power was ridiculous in the cold air.
' style=

Took this exactly parallel to cockpit floor.  Xpdr antenna poking out behind short stack.

Took this exactly parallel to cockpit floor. Xpdr antenna poking out behind short stack.

' style=

See how dirty this area is?  Will clean it and see if it stays clean. Hole for gasco no longer needed.

See how dirty this area is? Will clean it and see if it stays clean. Hole for gasco no longer needed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.