KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-20-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  PTT connections

Soldered up the pilot PTT lead (final under-spar configuration). So much of this time is spent running the extension cord, plug in the light, solder iron, heat gun, radio. Find strippers and clippers, electrical tape, heat shrink tube, cable ties, etc. Only got the pilot PTT done (4 solder connections). Left it all in place for next time - finish passenger side PTT and reinstall seat. Made a list of what to put into an electrical toolbox. Now just need to get the box.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.