KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-22-2008
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Instrument installation

Tightened the instruments into the LH panel. May need to take them back out when I get the VSI in case I end up needing to clearance that hole a little to get the instrument in. The ASI is a custom-painted Winter instrument from www.airstuff.com. The blank in the LH panel is where the GPS will sit, but if I change things, the ASI could move up there. The blank in the RH panel is where a g-meter might go. The hole at the top of the RH panel is for the fuel sight tube, and the sight tube bottom end is on the small panel extension on the right side.
' style=

Left side - mixture goes on the left, VSI on the right empty holes.

Left side - mixture goes on the left, VSI on the right empty holes.

' style=

RH panel test fit.  Need longer screws in a few places.

RH panel test fit. Need longer screws in a few places.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.