Powered By Kitlog Pro v2.0
Sonex 815 Build Logs
Sonex
Landing Gear
9-6-2009
< Previous Log Entry
Next Log Entry >
Date:
9-6-2009
Number of Hours:
1.00
Manual Reference:
Brief Description:
Gear leg fairings
Added the nutplates for the gear leg fairings inside the front corners of the cockpit bottom skin. Trimmed the gear leg fairings for the wheel pant bolt heads (now that those are in place) and installed the gear leg fairings.
RH nutplate.
LH nutplate
All gear fairings in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Home
Category
# Logs
# Hours
All
1053
1491
Avionics
49
61
Controls
32
41
Cowling
30
42
Empennage
89
142
Engine
100
107
Flights
111
141
Fuel System
34
44
Fuselage
269
441
Landing Gear
37
40
Miscellaneous
66
43
Panel
14
12
Shop Supplies
7
16
Wings
215
361
Copyright © 2001-2024 Matronics. All Rights Reserved.