Climbed up inside and put more Sika adhesive between the initial batch. Filled in locations I had left open for spacers. Set 14 pounds of dive weights on the forward edge because at one of the previously non-adhered locations the canopy was sticking up a little. Rolled it out into the driveway to get some solar heating to cure the adhesive maybe a little quicker. That stuff is pretty stinky while it is outgassing, though the stuff I put on yesterday was relatively odorless by this morning. Used up just about the entire tube of adhesive. Saved a little to do some touch up on the side trims on the outside. Forward and aft ends of these side trims have a little gap to the canopy which can be filled. Peeled off the protective covering on the outside except for where the dive weights are.
Rolled it out for some solar heating.
The actual width of the black strip can be seen near the bottom.