Made up the conduit bracket for the RH wing. Installed this. The wings can go to the airport now, when space becomes available. Only have to cotter pin the aileron hinges and fill in the tip rib rivets when I get the rest of those. Leveled the fuselage again to double check the engine for square. I thought it was 3/16" low on the forward end, but checking again, it is right on. So the engine will stay as-is, and now the cowling can begin.
Right wing root rib all done.
Leveled the fuselage, then extended the bottom line forwards with the level.