KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
' style=
Date:  3-25-2008
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Doors on cowling

Installed the fuel fill and oil check doors on the cowling. For the oil check, I got the Southco receptacle installed and the Southco screw sized up and installed. For the fuel fill door, I made an .032 spacer to go between the hinge and the cowl to pull the hinge down. As it was, the hinge sticks up a bit. I didn't do the Southco for this one yet - it's not hard, just a bunch of little steps and many different drill bits - more time consuming than I thought it would be.
' style=

Cowl access doors in place.

Cowl access doors in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.