KitLog pro

Powered By Kitlog Pro v2.0

Sonex 815 Build Logs
' style=
Date:  2-16-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Cowling installation

Got West epoxy and filler. Made up a form for the outside of the bottom of the cowling from .025 scrap coated with packing tape. Mixed up the epoxy and filler and built up the edge. Plan is to sand down the inside to about the same thickness as the surrounding material, then lay on a layer of BID to stabilize it, then trim to the needed width.
' style=

Epoxy in place.

Epoxy in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.