Redrilled the elevator pushrod after the corrections for clearancing the pushrod at the aft end were made. Still need to upsize and debur the holes and install the bolts. Won't bother with that though until the order of new (longer) bushings from Wicks shows up - none of the bushings on the control triangle to fuselage, elevator idler, or elevator pushrod were long enough.