KitLog pro

Powered By Kitlog Pro v2.0

Dr. P's KR2S
' style=
Date:  2-29-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Proseal stripping (Tanks)

Finally! Scrapped the last of the ribs and then the two baffles. Each got a fresh coat of EFS 2500 and were wrapped in plastic. Now, I get a break while these all set and soak for a couple days. Then, I will clean them and hopefully I be done. Might need to add a second coat on a few spots. That being said, I wold like to assemble them this coming weekend and see what needs to be modified or replaced.

Getting closer to fininshing these.
' style=

Scrapping the little spots of warm proseal

Scrapping the little spots of warm proseal

' style=

All ribs, baffles, and misc tank parts soaking with EFS 2500.  Break-time!

All ribs, baffles, and misc tank parts soaking with EFS 2500. Break-time!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.