Brief Description: Fiinshed decontructing the fire wall
Completed the full deconstruction. Deburred main firewall holes (F-601A-2) that had not been deburred (several). Stop drilled two crack in upper section. Reassembled the firewall for inventory. Will need to order WD-601-L/R-1, 1XF-601G-1, WD-603-R/L-1. The brackets were in total disrepair. The Gusset was simply missing.
In the meantime, all pieces wiil be cleaned, deburred (where needed), primed and then reriveted.