KitLog pro

Powered By Kitlog Pro v2.0

Matt's Hangar
' style=
Date:  4-18-2004
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Glassing begins

Final shaping of the HStab and Elevator. Started glassing the HStab. Got the bottom of the right side cut out and glassed in. The pic is of the elevator channel, which was glassed first.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.