KitLog pro

Powered By Kitlog Pro v2.0

Matt's Hangar
' style=
Date:  6-3-2005
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Control stick linkage

Got the control stick pushrod linkage all cut/tapped and installed. Also, rigged the elevator cables temp. to get them the correct length. Eveything seems to work nicely!
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.