KitLog pro

Powered By Kitlog Pro v2.0

Matt's Hangar
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-29-2006
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Trim Tab Construction

Cut out the trim tab and started the construction process.
Hinge was set on the elevator side and all ends were filled with flox compound
on elevator and trim tab. Should be ready to finish up tomorrow.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.