KitLog pro

Powered By Kitlog Pro v2.0

EJ Andersons RV-8 Builders Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-8-2012
Number of Hours:  5.00
Manual Reference:  Section 6
Brief Description:  Drilling the Vert Stab

Clecoed the rear spar doubler and hinge brackets to the rear spar channel. Then I drilled the holes in the upper half of the lower hinge bracket. All vertical stab ribs were prepared by adding fluting where needed and polished all edges and lighting holes. After clecoing all vertical stab under structure parts together, I final drilled all rib-to-spar and doubler to spar channel attachment areas to #30 drill. The vertical stab skin was then Clecoed into position and final drilled to #40. All parts were disassembled and marked.
' style=

Vert Stab sub structrure drilled.

Vert Stab sub structrure drilled.

' style=

Vert Stab Ribs fluted and deburred.

Vert Stab Ribs fluted and deburred.

' style=

Vert Stab after final drill.

Vert Stab after final drill.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.