Brief Description: locate F8 and F9 and start top skin
Spliced longerons to proper length using small sections of angle. Staggered splice location port and stbd. Located longerons and confirmed equal distance from firewall to each end. Anchored and spliced longerons using splice plates previously made in AZ. Provided temporary tabs at F10 to hold longerons in place during skin fit up.
Drilled starting top center hole at F6 location and placed precut skin on the bulkheads. Located skin center hole over F10 and drilled and clecoed in place. Used 1x2s and strap clamps to pull top skin to shape around the bulkheads. Checked top skin level before proceeding.