Brief Description: began fit up of left leading edge
made pipe clamp for 2"PVC pipe. clamped tp oinside of leading edge and reshaped. began fitting leading edge to left ribs and dimpled previously drilled holes. clamped into place, match drilled leading edge to existing spar holes and completed riveting bottom section.