Brief Description: drilled and clecoed left elevator
trimmed elevator skin to proper size then. Drilled and clecoed port elevator and layed out yoke bolt location. Opened up all holes to #30 in preparation for dimpling. Layed out cut lines on stbd elevator. Needs trimming. Drilled and clecoed sybd elevator and noted that outboard rib was bent reversed. Remade the piece and fit it into existing assembly. match drilled and clecoed into place.