KitLog pro

Powered By Kitlog Pro v2.0

EDWARD'S WEB SITE
' style=
Date:  1-9-2011
Number of Hours:  3.50
Manual Reference:  
Brief Description:  fabricated clamps and installed tubing and wiring

Fabricated tubing and wiring guides and riveted into front ribs. Color coded tubing and installed pitot tubing and nav light wiring into front ribs. taped the lightening holes in the front ribs to protect the wiring and tubing.
' style=

front ribs shown with cable and tubing in place

front ribs shown with cable and tubing in place

' style=

tubing and cable run

tubing and cable run

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.