KitLog pro

Powered By Kitlog Pro v2.0

DOUGs Web Site
' style=
Date:  4-1-2019
Number of Hours:  1.50
Manual Reference:  
Brief Description:  2 - re installed vertical stab & rudder

I drilled out the 4 holes in the vertical stab and inserted rivnuts, re-installed the vertical stabilzer and access covers, and then re-installed the rudder. All bolts and nuts were torqued to spec and then I applied torque seal.
' style=

installed rivnuts

installed rivnuts

' style=

installed vert stab

installed vert stab

' style=

installed rudder

installed rudder

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.