KitLog pro

Powered By Kitlog Pro v2.0

DOUGs Web Site
' style=
Date:  3-25-2019
Number of Hours:  1.00
Manual Reference:  
Brief Description:  2 - Installed vertical stabilizer

I installed the 8 rear and front 4 vertical mounting bolts, torqued and applied torque seal to the nuts of the through hole hardware and the bolt heads of the anchor nut hardware.
' style=

rear vert stab mtg bolts

rear vert stab mtg bolts

' style=

front vert stab mtg bolts

front vert stab mtg bolts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.