KitLog pro

Powered By Kitlog Pro v2.0

DOUGs Web Site
' style=
Date:  12-12-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Firewall preparation

I prepared the firewall for the insulation material by removing sticky labels, and taping over unused holes with some high temperature tape I found on Amazon. I also finished riveting the steering boots, torqued the two nuts on the firewall brace and applied torue-seal.
' style=

riveted steering boots

riveted steering boots

' style=

high-temp tape

high-temp tape

' style=

taped over holes, torqued nuts

taped over holes, torqued nuts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.