I cut a couple of pieces of tubing from the pitot lines, insert the vent lines, and then kinked & secured with tie wraps in preperation for leak testing. I also installed the sump valves with loctite 577, installed the gas caps and then fitted balloons over the fittings with an o-ring clamp to seal the balloon neck.