Powered By Kitlog Pro v2.0
DOUGs Web Site
Sling 2
All
8-8-2018
< Previous Log Entry
Next Log Entry >
Date:
8-8-2018
Number of Hours:
0.50
Manual Reference:
Brief Description:
Left wing bottom side work
I installed the flap torque tube with some grease in the bushings, and then layed the bottom skins over the structure. The bottom stringer was bent from shipping so I tweaked it into shape with a manual bending tool.
install flap torque tube
bent stringer from shipping
layed out bottom skins, fixed stringer
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sling 2 Home
Category
# Logs
# Hours
All
484
705
Avionics
71
109
Canopy
1
0
Central Fuselage
86
138
Controls
30
35
Elevator
16
31
Engine
12
10
Firewall Forward
33
39
Horiz Stabilizer
10
18
Miscellaneous
5
0
Rear Fuselage
63
101
Rudder
9
14
Shop & Tools
9
5
Undercarriage
16
16
Vertical Stabilizer
11
17
Wings
112
172
Copyright © 2001-2024 Matronics. All Rights Reserved.