I poked around the fuselage looking for things I might have missed, stuff I need to do, etc. I installed the final 2 nuts & bolts on both of the canopy slides, clecod some brackets needed later for the rear fuselage and chased drilled out rivets trapped between the floor panels. I go some of them out but I'll probably have to remove a short piece of channel on either side to get the rest.