KitLog pro

Powered By Kitlog Pro v2.0

DOUGs Web Site
' style=
Date:  5-3-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  2 - Nose gear preparation

I began preparing the nose gear by sanding the bearing surface of the shaft so that the thrust bearings will fit over it easier. Lots of sanding. I greased the shaft and installed the thrust bearing, shock spring and bushings. The threads for the cap plate were coated with paint, so I ran a 1/4-28 tap through them to clean them out. Finally, I installed the wheel & tire assembly and spat brackets.
' style=

sanding shaft to fit thrust bearings

sanding shaft to fit thrust bearings

' style=

Used a 1/4-28 tap to clean threads

Used a 1/4-28 tap to clean threads

' style=

nose gear prep complete

nose gear prep complete

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.