KitLog pro

Powered By Kitlog Pro v2.0

DOUGs Web Site
' style=
Date:  4-24-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  RRibs #3 & #2 completed

I struggled for an hour with fitting rib #3 to the assembly fixture, but finally figured out the I had left / right labeling problem and then everything went smooth with this assembly. Rib #2 didn't fit the fixture at all that I could tell, but it went together well. I clecoed every rivit hole, layed it flat on the floor and riveted it together. They both look good!
' style=

Rib #3 final assembly

Rib #3 final assembly

' style=

Rib #2 completed

Rib #2 completed

' style=

Temporary Rib Storage

Temporary Rib Storage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.