Work continued on the right wing stub skin today. Image 1 shows the bottom of the skin drilled and clecoed to the substructure. Image 2 shows the top of the same skin. Once the skin was drilled and the rib locations firmly established, the access panels were cut and back-up rings made as shown in image 3