There has been about a month gap since the last entry. I mentioned that I had another project going on and it is now complete. This project will show up in future pictures of the hangar. It is a golf studio that allows for golf practice using real clubs and balls in a radar based simulator. I show a picture inside the curtains in image 1. Back to the Nexus, Progress was made on the Nose rib at BL: 49.5 by adding stiffeners, and the fuel flapper valve as shown in image 2. Finally, I started on the forward spar "C" sections. Image 3 shows the spars during initial fit-up of the ribs and fittings.
Driving Range behind the black curtain in the hangar