KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
' style=
Date:  11-1-2023
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Torque tube forward bulkhead fabrication

The forward torque tube mount bulkhead and support structure was fabricated. Image 1 shows trial installation of the angle fittings to existing fuselage structure as well as the shear web that attaches to all of them. After all of the parts were removed, trimmed, deburred and primed, they were riveted into position as shown in image 2 & 3. The bushings are for the rudder cables. A string was stretched between the pedals and aft pulleys to ensure that the location was correct.
' style=

Fabricating forward torque tube bulkhead assy

Fabricating forward torque tube bulkhead assy

' style=

Final installation of bulkhead

Final installation of bulkhead

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.