Started to fabricate the forward skin. I used the normal rolling method to get the skin to match the bulkheads fairly well, then clamped the skin in place. Next, I used the laser level to ensure the skins were cut on a straight fuselage station. Finally, the skin was drilled to the firewall and FS: 14.25 bulkheads