Powered By Kitlog Pro v2.0
Andrews Web Site
Nexus Mustang
Fuselage
5-5-2021
< Previous Log Entry
Next Log Entry >
Date:
5-5-2021
Number of Hours:
8.00
Manual Reference:
Brief Description:
Rudder pedal shaft brackets
Fabricated some of the brackets that will be needed for the rudder pedal assembly. This shaft will need to be fitted with the forward tunnel assembly that was just completed.
Brackts and Rough Lever arms
Showing lever arms separated and finalized
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Nexus Mustang Home
Category
# Logs
# Hours
All
541
2944
Elevator
27
92
Empennage
87
246
Engine
2
25
Flaps and Ailerons
27
280
Flight Controls
1
20
Forming Parts
15
54
Fuselage
184
1059
Landing Gear
7
46
Miscellaneous
2
6
None
1
Part and Tool Accumu
20
57
Rudder
31
61
Tools
3
26
Wing Spar
24
104
Wings
110
868
Copyright © 2001-2024 Matronics. All Rights Reserved.