Welded the stabilizer fittings. Drilled the side skin holes between the upper and lower skins (.75 spacing) Fit doubler 164.25 bulkhead. Drilled attach holes in tailwheel weldment. Cut hole in lower skin for tailwheel weldment.
Stabilizer attach fittings welded
Finished drilling in side skin
Fit extra 164.25 bulkhead and cut tailwheel fitting hole.