KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
' style=
Date:  8-6-2020
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Outer Spar Preparation

I started to prepare the outer spar cap strips by creating a drilling fixture (board with spacers) that allows me to stack the caps in the proper order, then drill them all together. I started with a 3/32 hole, so you have to peck drill the holes to keep chips from building. There are lots of holes to drill, so the task is somewhat tedious (as if this whole project isn't ha ha)
' style=

Fixture to hold cap strips for drilling

Fixture to hold cap strips for drilling

' style=

Drilling holes

Drilling holes

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.