KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
' style=
Date:  7-29-2020
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Getting Spar Fittings Ready for Paint

I don't want to get paint in the close tolerance holes that attach fittings to the spar, so I plugged them with wooded dowels beforehand. Some of the dowels are long, others are short (per the photos) This was a code I used in order to keep track of what fittings went where. There are 8 fittings and it is important to get them in the right location and facing in the right direction.
' style=

Getting spar fittings ready for prime and paint

Getting spar fittings ready for prime and paint

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.