KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
' style=
Date:  7-3-2023
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Rigging the main landing gear

The main landing gear was rigged and tack welded in place. Image 1 shows a positioning block that I made to aid in clamping the gear leg to the mounting post. Once clamped, all of the key rigging dimensions could be established to position the axle base at the proper location in 3-dimensional space. I had to make a heavy duty 220V extension cord to allow me to relocate my welder to the wing fixture (shown in image 2). Finally, the gear mounting plate and gussets were all tack welded so that the gear mounts could be removed for final welding. (Image 3)
' style=

Clamping the gear and gussets for positioning and tack welding

Clamping the gear and gussets for positioning and tack welding

' style=

Working on the left wing set-up

Working on the left wing set-up

' style=

Both gears rigged and tacked

Both gears rigged and tacked

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.