KitLog pro

Powered By Kitlog Pro v2.0

Andrews Web Site
' style=
Date:  6-22-2023
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Aileron bellcrank fabrication

I have been out of town for about a month, so progress was halted.
I have now begun work on the aileron bellcranks. This required cutting and bending some .063 4130 into the proper form, then welding to a 1/2 OD tube. The tube was welded, then reamed as needed to allow smooth rotation of a 3/8 dia inner tube. Images 1-3 show the process. Welding of the first arm in image 1 required making a wooden holding fixture to make sure everything was square to the tube. The wood lasts just about two welds before it burns up.
' style=

Center arm welded to tube

Center arm welded to tube

' style=

Preparing second weld using block to keep things square

Preparing second weld using block to keep things square

' style=

Final left and right bellcranks

Final left and right bellcranks

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.