KitLog pro

Powered By Kitlog Pro v2.0

Garys Web Site
' style=
Date:  6-24-2012
Number of Hours:  1.00
Manual Reference:  Pg. 237
Brief Description:  Insturment Pod to Front Upper Keel booms

Whip out two spacers on the lathe 1.376 in. long & ??? round. Used two AN4-20A bolts and all done.

After aligning clamps with pod I was look at pictures of other M912s and noticed that clamps are aligned as in Image #2. I assemble pod mounts in Image #1 so not to bend clamp ear and not having the spacer and having to make my own. It seemed like the right way to put it together at the time.

Note: Correction made on 8/31/2013 - Back to original design. Image 2
Image 3 - 8/31/13 - Correction
' style=





' style=

The Right Way

The Right Way

' style=

8/31/2013 - Correction

8/31/2013 - Correction

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.