Just for a change of pace, I created the MDF jigs for the Aileron Nose, Aileron Pocket, and Flap Nose Ribs. I've got them 90% done. I need to band saw the areas in between the flanges and then use my 1" belt sander to bring it to the line. Then it's off to the router table to knock out the copies.