Date:  12-27-2016
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Start on spars

Did a couple of little things on the fues. and then it was essentially everything on it has been installed. Much easier to put together when it is covered and painted.

Decided to start the wings. Build one wing, but do all 4 spars now and things like both belcranks when it comes time for them. After one wing is mostly done and in the rotating jig, go and cover the fues. for a break and then come back to wings.

Reorganized the hanger with the fues parallel to the -10. This will be crowded when the Raven is done, two fairly big aircraft in a 44' X 40' hanger. Went to the store and got some 8' 2X4s to convert my two sawhorses 5' long. Covered them with carpet and put blocks on the ends so the spars cannot roll off and get bent up. Laid out the spars and marked them as to fore and aft and left or right. Put the main double in and got ready to start drilling holes.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.